Utilities |
Click picture for larger view. Electricity is provided by Duke Energy. Line voltage of 12470/7200 volts is available. Velocity Park can be served from 3 separate electrical sub-stations. Redundant power is available. Water is available from Greer Commission of Public Works (CPW). 12” and 6” water lines are immediately adjacent. A water service provider letter from Greer CPW may be reviewed. Sanitary Sewer is also provided by Greer CPW. An 8” line and a 4” force main are immediately adjacent. In addition, a sewer lift station is located just off the northeast corner of Site 4. A wastewater treatment owner letter from Greer CPW may be reviewed. Natural Gas is available from Greer CPW. 4” and 2” natural gas lines are adjacent to the properties. Telecommunications, Data, & Fiber are available from AT&T, Verizon, and other providers. Two of AT&T’s fiber rings overlap at Velocity Park, allowing for redundant fiber services from AT&T. A letter from AT&T may be viewed. A Telecom Focus Site Study was completed in August, 2012, and is summarized here. |